Pre-market checklist
To print, complete in the conformity review session, sign and archive with the technical documentation. No point may remain open when the marking is affixed.
Product: ______________________ Exact version: ______________________
Review date: ____________ Planned market entry: ____________
Scope and classification
- 1. The product is qualified as a PDE; the qualification sheet is signed and filed. → Scope
- 2. Exclusions have been examined and ruled out, or a reasoned exclusion sheet exists. → Exclusions
- 3. The criticality class is determined and justified by a co-signed classification sheet. → Classes
Conformity route
- 4. The assessment route is chosen and documented; where a notified body is required, it is engaged and its certificate is in the file. → Assessment
Essential requirements
- 5. The cybersecurity risk assessment is carried out, dated, signed, and justifies the requirements ruled out.
- 6. The applicable Annex I, Part I requirements are covered; the traceability matrix is complete. → Product security
- 7. The Annex I, Part II vulnerability handling process is operational and documented. → Vulnerability handling
Bill of materials and disclosure
- 8. The SBOM for this exact version is generated, validated above the quality threshold, signed and archived. → SBOM
- 9. The coordinated disclosure policy is published and the contact point is live and tested. → Disclosure policy
Life cycle and information
- 10. The support period is determined, justified in the file, approved by executive management and communicated to the buyer to the month. → Support
- 11. The Annex II information and instructions to the user are drafted, translated and shipped with the product. → User information
File and declaration
- 12. The Annex VII technical documentation is complete; its version is frozen and referenced. → Technical documentation
- 13. The Annex V EU declaration of conformity is drawn up, accurate and signed by an authorised person. → Declaration
Operational
- 14. The 24 h / 72 h / 14 d reporting procedure is in place, the on-call rota is designated and the channel has been tested for this product. → Reporting
- 15. Ten-year archiving is configured for every item, and retrieval has been tested. → Retention
Decision
- Authorisation to affix the CE marking and place the product on the market.
- Refused — reasons and remediation deadlines:
Accepted reservations (open points, with owner and resolution date):
| Role | Name | Signature | Date |
|---|---|---|---|
| Legal department | |||
| CISO | |||
| Product management |
Reminder. This checklist is not paperwork: it is the record that will demonstrate, in an inspection, that conformity was verified before placing on the market. A signed checklist with boxes ticked incorrectly is more damaging than an honest one carrying reservations.